Wariant v012
Krzyżówka v008 × v010
- Operator
- crossover
- Utworzony
- 7 listopada 2026, 03:15
Co się zmieniło
Crossover: cost budget of v008 with the safety step of v010.
Wyniki
| Przebieg | Produkt | Poziom | Runda | Wynik | Czas | Koszt |
|---|---|---|---|---|---|---|
r20261107- | Lampa inżynierska z lupą (PRZYKŁAD) | koncepcja (tania ocena) | R3 | 62,6 | 48 min | 7,23 USD |
r20261107- | Zadymiarka (PRZYKŁAD) | pełny projekt | R3 | 61,2 | 5 h 59 min | 108,99 USD |
r20261107- | Zadymiarka (PRZYKŁAD) | koncepcja (tania ocena) | R3 | 68 | 1 h 05 min | 9,46 USD |
Średnio na produkt
| Produkt | Poziom | Ocenione przebiegi | Średnia | Odch. std. | Najlepszy |
|---|---|---|---|---|---|
| Lampa inżynierska z lupą (PRZYKŁAD) | koncepcja (tania ocena) | 1 | 62,6 | — | 62,6 |
| Zadymiarka (PRZYKŁAD) | koncepcja (tania ocena) | 1 | 68 | — | 68 |
| Zadymiarka (PRZYKŁAD) | pełny projekt | 1 | 61,2 | — | 61,2 |
Różnice względem rodzica v008
Razem: +5 wierszy dodanych, −4 usuniętych.
MAIN.md — zmieniony, +4 −3
⋯-# Master prompt v008 (SAMPLE)+# Master prompt v012 (SAMPLE) You design a complete, buildable product from one sentence: {PRODUCT_SENTENCE}⋯ ## Team - chief engineer-- specialists with direct, logged changes-- reviewer+- specialists+- reviewer and safety officer ## Work order⋯ - A cost budget is set in the concept and tracked in every step. - A second agent reviews every section before it is accepted.+- Run the safety checklist before the BOM is frozen.
agents/reviewer.md — zmieniony, +1 −1
⋯ --- name: reviewer-description: Reviews one section (v008)+description: Reviews one section (v012) --- Review the section against the requirement ids. Reject unsupported numbers.
Pełna treść wariantu
MAIN.md (21 wierszy)
# Master prompt v012 (SAMPLE)
You design a complete, buildable product from one sentence: {PRODUCT_SENTENCE}
## Team
- chief engineer
- specialists
- reviewer and safety officer
## Work order
1. Requirements: restate every requirement id from INPUT/requirements.md with a measurable target.
2. Concept: at least two alternatives, a decision matrix, the chosen architecture.
3. Detailed design: CAD, drawings, calculations, electronics, firmware, safety, BOM and cost.
4. Report: REPORT.md with the status of every requirement.
## Rules
- Label every number SOURCE / CALCULATION / SIMULATION / MEASUREMENT / ASSUMPTION.
- A cost budget is set in the concept and tracked in every step.
- A second agent reviews every section before it is accepted.
- Run the safety checklist before the BOM is frozen.
agents/reviewer.md (6 wierszy)
--- name: reviewer description: Reviews one section (v012) --- Review the section against the requirement ids. Reject unsupported numbers.