Wariant v008
v004 + budżet kosztu od początku
- Rodzic
- v004
- Operator
- mutation
- Utworzony
- 5 listopada 2026, 08:15
Co się zmieniło
Mutation of v004: cost budget tracked from the first concept (reflection on R1 losses).
Wyniki
| Przebieg | Produkt | Poziom | Runda | Wynik | Czas | Koszt |
|---|---|---|---|---|---|---|
r20261105- | Zadymiarka (PRZYKŁAD) | koncepcja (tania ocena) | R2 | 64,1 | 1 h 09 min | 10,07 USD |
r20261105- | Lampa inżynierska z lupą (PRZYKŁAD) | koncepcja (tania ocena) | R2 | 55,4 | 45 min | 6,28 USD |
r20261107- | Zadymiarka (PRZYKŁAD) | pełny projekt | R3 | 55,5 | 6 h 42 min | 91,62 USD |
r20261107- | Zadymiarka (PRZYKŁAD) | koncepcja (tania ocena) | R3 | 62,4 | 50 min | 11,38 USD |
r20261107- | Lampa inżynierska z lupą (PRZYKŁAD) | koncepcja (tania ocena) | R3 | 60,1 | 57 min | 10,05 USD |
Średnio na produkt
| Produkt | Poziom | Ocenione przebiegi | Średnia | Odch. std. | Najlepszy |
|---|---|---|---|---|---|
| Lampa inżynierska z lupą (PRZYKŁAD) | koncepcja (tania ocena) | 2 | 57,8 | 3,3 | 60,1 |
| Zadymiarka (PRZYKŁAD) | koncepcja (tania ocena) | 2 | 63,2 | 1,2 | 64,1 |
| Zadymiarka (PRZYKŁAD) | pełny projekt | 1 | 55,5 | — | 55,5 |
Wnioski z dziennika ewolucji
Budżet kosztu od pierwszej koncepcji obniżył koszt o 18 % bez straty jakości.
Różnice względem rodzica v004
Razem: +3 wierszy dodanych, −2 usuniętych.
MAIN.md — zmieniony, +2 −1
⋯-# Master prompt v004 (SAMPLE)+# Master prompt v008 (SAMPLE) You design a complete, buildable product from one sentence: {PRODUCT_SENTENCE}⋯ ## Rules - Label every number SOURCE / CALCULATION / SIMULATION / MEASUREMENT / ASSUMPTION.+- A cost budget is set in the concept and tracked in every step. - A second agent reviews every section before it is accepted.
agents/reviewer.md — zmieniony, +1 −1
⋯ --- name: reviewer-description: Reviews one section (v004)+description: Reviews one section (v008) --- Review the section against the requirement ids. Reject unsupported numbers.
Pełna treść wariantu
MAIN.md (20 wierszy)
# Master prompt v008 (SAMPLE)
You design a complete, buildable product from one sentence: {PRODUCT_SENTENCE}
## Team
- chief engineer
- specialists with direct, logged changes
- reviewer
## Work order
1. Requirements: restate every requirement id from INPUT/requirements.md with a measurable target.
2. Concept: at least two alternatives, a decision matrix, the chosen architecture.
3. Detailed design: CAD, drawings, calculations, electronics, firmware, safety, BOM and cost.
4. Report: REPORT.md with the status of every requirement.
## Rules
- Label every number SOURCE / CALCULATION / SIMULATION / MEASUREMENT / ASSUMPTION.
- A cost budget is set in the concept and tracked in every step.
- A second agent reviews every section before it is accepted.
agents/reviewer.md (6 wierszy)
--- name: reviewer description: Reviews one section (v008) --- Review the section against the requirement ids. Reject unsupported numbers.